Request a Screening Report

Facility Intake Form

Complete the form below to request your Asset Carbon Risk Screening Report. Fields marked * are required to generate the report. Optional fields improve accuracy.

DC Screening Report — €3,500 + VAT · Invoice-based · No payment required now
Invoice and report will be sent to this address.
Town, county, or Eircode. Used for free-cooling hours and grid operator lookup.
Year facility first energised. Used to calculate facility age for CRREM pathway.
Installed IT load in megawatts. Not total facility load.
Current average watts per rack position. Typical: 4–10 kW legacy, 30–100 kW AI.
Total raised-floor or white-space area in square metres.
Actual operational PUE. Used for carbon intensity and CRREM pathway calculation.
% of electricity from renewable PPA or GoOs. Enter 0 if none. CRU requires 80% for new/expanding DCs.
Up to 20 kV = ESB Networks. Above 20 kV = EirGrid. Check your connection offer letter.
From ESB Networks / EirGrid connection offer. Enter in MVA.
Annual test + operational hours. Typical: 100–200 hrs standard, 200–400 grid-constrained sites.